Wednesday 3 July 2013

Mount Pleasant 2013 - Set Design

In my second series of MP we were required to build a pub set rather than film out on location.  After a briefing from the Production Designer I set about building models and producing technical drawings of the new set.  The set was built by WRC Ltd and the build took around five weeks.
Early 1:50 model
Early 1:50 model
A shot from inside the model

1:50 scale drawings
1:10 scale drawings of details
1:20 scale drawings of details
The set under construction
The finished dressed set
The finished dressed set

The finished dressed set




Tuesday 2 July 2013

Let them eat cake

Here is a little bit of cake design.  A simple brief - design a cake that looks like a 'Gibson Les Paul'.  The cake was make by te very talented people at The Ash Tea Rooms.
My visual of the cake

The finished cake